27 April 2010
At the end of 2009, 1.6 MWp had already been connected to the grid, and completion is scheduled for 2011.
A total of 4899 Kyocera KD210GH-2PU solar PV modules and 2700 KD205GH-2PU solar PV modules have been installed.
This article is featured in: Photovoltaics (PV) • Solar electricity
You must be registered and logged in to leave a comment about this article.
Email Address
Password
Forgotten login?