Related Links

Related Stories

  • Iberdrola to build 102.85 MW windfarm in Mexico
    The construction contract for the 102.85 MW La Venta III windfarm in Mexico has bee awarded to Iberdrola Renovables by the Mexican Federal Electricity Commission (CFE).
  • Suzlon feels the need for speed
    Suzlon needs little introduction. The wind turbine manufacturer embodies the rise of renewable energy, perhaps more than any other company in the world. Founded in India in 1995, the wind group now ranks fifth worldwide and had a 7.7% share of the global turbine manufacturing market in 2006. It is the market leader in India, where it has installed more than 2GW of wind capacity and owns over 30 wind farms. David Hopwood speaks to Group CEO Andre Horbach.
  • Abu Dhabi's Masdar plan takes shape
    If anyone was in any doubt that the UAE’s Abu Dhabi is serious about its alternative energy credentials, think again. The richest Emirate's vision to look past its vast fossil fuel heritage and be seen as purveyors and thought leaders of a brave new world of sustainable living and renewable energy development is gaining momentum rapidly. David Hopwood visited Abu Dhabi and the World Future Energy Summit (WFES) to see for himself.
    Members' Content
  • China to lead global wind energy development?
    There is good news in the wind for proponents of wind power. Wind turbine capacity has been increasing dramatically, and the unit cost of power generated by wind energy is expected to drop further. Much of this will continue to be credited to China’s efforts, according to a new report from the Global Intelligence Alliance.
  • £10m for renewable energy initiatives by UK communities
    Twelve UK communities have received grants to install solar panels, wind turbines and other renewable energy technologies, under a national challenge to reduce carbon emissions.

News

Indian Energy installs three wind turbines

08 February 2010

Indian Energy Ltd says the first three wind turbines at its Theni Project have been commissioned and are now fully operational and grid connected.

In December, Indian Energy signed a contract with ReGen Powertech Private Ltd for the construction of a 49.5 MW wind farm at Theni in the State of Tamil Nadu, India.

The three initial wind turbines are part of the first phase of development of the project which will see a further 8, 1.5 MW wind turbines within the next five months, bringing the total capacity to 16.5 MW.

The second construction phase is due to start in June 2010, bringing the total up to 49.5 MW, the owner and operator or wind farms in India says.

The Tamil Nadu Electricity Board (TNEB) has approved the Power Purchase Agreement (PPA) with Indian Energy, which will shortly enter into the 20 year PPA with TNEB for the sale of the power generated at Theni at a rate of Rs. 3.39 per kWh as governed by the current State Tariff Order.

The Theni wind farm project should also be eligible for the Generation Based Incentive scheme that has recently been announced by the Government of India and as a result receive a further INR 0.5 per kWh in revenue.

Furthermore, Indian Energy intends to establish the Theni wind farm as a Clean Development Mechanism (CDM) under the Kyoto Protocol.

 

This article is featured in:
Wind power

 

Comment on this article

You must be registered and logged in to leave a comment about this article.