04 February 2011
By Renewable Energy Focus staff
The construction be managed by ABB and REC who have formed a temporary EPC consortium.
The solar power plant will cover around 95 hectares and produce 47 GWh annually.
This article is featured in: Photovoltaics (PV) • Solar electricity
You must be registered and logged in to leave a comment about this article.
Email Address
Password
Forgotten login?